HOME | ABOUT US | PLC TECNOLOGY | PRODUCTS CASE STUDIES | DOWNLOADS | NEWS | CONTACT US

:: SPANISH

 
SPEED TEST | MY IP
 
 
 
 
Case Studies
 
 
 
Our Clients
 
Client testimonials
 
 
Comfort Inn Case Study
"The installers completed the job within two working days - a two-man job. There was absolutely no disruption to guests; no rooms needed to be  placed out of service during the installation."
  (photo coming soon) Foyer de L'Enfant Jesus Case Study
"This solution is perfect for us - affordable, powerful and easily scalable.  Installation could not have been quicker, and we have achieved a huge amount of flexibility for a limited budget."

Hempstead House

Hempstead House Case Study
"It was essential for us to be able to offer broadband access to our business guests and conference delegates - by the swiftest and most economical method. This has proved to be an elegant solution, and a perfect match to our requirements." 

Holiday Inn Express Case Study
"Guests simply put their laptops into the Telkonet iBridge and into an electrical outlet and they have  Internet access. It is really that easy." 

InnSeason Case Study

“Telkonet allowed us to offer this service with a small investment, thus not affecting our owner’s annual maintenance fees, a very important fact.”

The Pines Case Study

“We were looking for the quickest way we could provide Internet access to our owners with a minimal upfront expense and wanted to provide it in a way that impacted our owners the least.”

Quality Inn 
"The decision to  select Telkonet was based on price, ease of use and receptiveness to the hotel’s needs."
Sandman Hotels, Inns and Suites Case Study
"The system can be used regardless of when the property was built, since every hotel has electrical wiring. Most importantly, the system provides the  level of service that our guests are looking for." 
The Whitney Case Study
"The Whitney residents can plug into virtually any electrical outlet and then are online,
quickly and conveniently. And with the speed, there's definitely a wow factor to this
solution."
Welleby Park Case Study
"We  saved a lot of money and time with the installation.  It would have been cost-prohibitive to rewire all of  the nine buildings with cable, not to mention the  disruption and the mess. We couldn't have found a more ideal solution." 
WyteStone Case Study
"I would say the Telkonet system cost about  one-third of what a wireless system would have run  us. By comparison, a hard-wired system with new cabling installed would have cost about three times  more than the PLC solution we picked."
 
 
 
:: CUSTOMER ACCESS

USER NAME:

 

PASSWORD:

     
 
 

 © EkoPLC | Copyright 2006 -  All rights reserved  | Spanish