|
Client testimonials |
|
|
|
|
 |
Comfort Inn Case Study
"The installers completed the job within two working days - a
two-man job. There was absolutely no disruption to guests; no
rooms needed to be placed out of service during the
installation." |
|
(photo coming soon) |
Foyer de L'Enfant Jesus Case Study
"This solution is perfect for us - affordable, powerful and
easily scalable. Installation could not have been quicker,
and we have achieved a huge amount of flexibility for a
limited budget." |
|
 |
Hempstead House Case Study
"It was essential for us
to be able to offer broadband access to our business guests
and conference delegates - by the swiftest and most economical
method. This has proved to be an elegant solution, and a
perfect match to our requirements." |
|
 |
Holiday Inn Express Case Study
"Guests simply put their laptops into the Telkonet iBridge and
into an electrical outlet and they have Internet access. It
is really that easy." |
|
 |
InnSeason Case Study
“Telkonet allowed us to offer this service with a small
investment, thus not affecting our owner’s annual maintenance
fees, a very important fact.” |
 |
The Pines Case Study
“We were looking for the quickest way we could provide
Internet access to our owners with a minimal upfront expense
and wanted to provide it in a way that impacted our owners the
least.” |
 |
Quality Inn
"The decision to select Telkonet was based on price, ease of
use and receptiveness to the hotel’s needs." |
 |
Sandman Hotels, Inns and Suites Case Study
"The system can be used regardless of when the property was
built, since every hotel has electrical wiring. Most
importantly, the system provides the level of service that
our guests are looking for." |
 |
The Whitney Case Study
"The Whitney residents can plug into virtually any electrical
outlet and then are online,
quickly and conveniently. And with the speed, there's
definitely a wow factor to this
solution." |
 |
Welleby Park Case Study
"We saved a lot of money and time with the installation. It
would have been cost-prohibitive to rewire all of the nine
buildings with cable, not to mention the disruption and the
mess. We couldn't have found a more ideal solution." |
 |
WyteStone Case Study
"I would say the Telkonet system cost about one-third of what
a wireless system would have run us. By comparison, a
hard-wired system with new cabling installed would have cost
about three times more than the PLC solution we picked." |